Transport And Traffic — total $96.1M

Strategic Transport

Project2023–20242024–20252025–20263 Year TotalSource
Alice Street and Queen Street Intersection Upgrade
Upgrade of the intersection of Alice Street and Queen Street, Goodna.
$200k$200kPDF p.2 ↗
Augusta Parkway – Sinnathamby Boulevard Road Upgrade
Upgrade of Augusta Parkway – Sinnathamby Boulevard, Springfield Central (4 lane urban road standard) from Eden Station Drive and Main Street.
$500k$12M$12.5MPDF p.2 ↗
Blackstone Road, Thomas Street and Creek Street Intersection Upgrade
Upgrade of the intersection of Blackstone Road, Thomas Street and Creek Street, Silkstone to a roundabout.
$100k$2M$2.1MPDF p.2 ↗
Corridor Planning / Concept Design Work
Corridor planning / early concept design work for iGO identified projects.
$100k$100k$200kPDF p.2 ↗
Eden Station Drive / Northern Sports Fields Intersection Upgrade
Upgrade of Eden Station Drive / Northern Sports Fields Access, Springfield Central, to signalised intersection.
$800k$800kPDF p.2 ↗
Fischer Road Upgrade
Upgrade of Fischer Road, Ripley (2 lane urban road standard) from Nevis Road and Monterea Road.
$200k$200kPDF p.2 ↗
Hooper, Moffatt and Pound Street Intersection Upgrade
Upgrade of the intersection of Hooper Street, Moffatt Street and Pound Street, West Ipswich.
$150k$150kPDF p.2 ↗
Jones Road and Harris Street Intersection Upgrade
Upgrade of the intersection of Jones Road, Harris Street and Alesana Street, Bellbird Park.
$100k$100kPDF p.2 ↗
Jones Road Upgrade – Stage 1
Upgrade to Jones Road from Augusta Parkway to Brennan Street to a 2 lane urban standard.
$100k$100k$150k$350kPDF p.3 ↗
Jones Road Upgrade – Stage 2
Upgrade to Jones Road / Church Street from Brennan Street to Alice Street to a 2 lane urban standard.
$100k$100k$150k$350kPDF p.3 ↗
Keidges Road and Alawoona Street Intersection Upgrade
Intersection safety improvements for Keidges Road and Alawoona Street, Redbank Plains.
$150k$150kPDF p.3 ↗
Keidges, Willow and Brittains Road Intersection Upgrade
Upgrade of the intersection of Keidges Road, Willow Road and Brittains Road, Redbank Plains.
$200k$200kPDF p.3 ↗
Mary Street and William Street Intersection Upgrade
Upgrade of the intersection of Mary Street and William Street, Blackstone including traffic signals.
$4.9M$4.9MPDF p.3 ↗
Mary Street Road Upgrade
Upgrade of Mary Street, Blackstone (4 lane urban road standard) from Cunningham Highway to Thomas Street; and Mary Street extension (2 lane urban road standard) from Thomas Street, Blackstone to Robertson Road, Raceview / Silkstone.
$100k$150k$250kPDF p.3 ↗
Redbank Plains Road Upgrade – Stage 3
Upgrade of Redbank Plains Road, Bellbird Park / Redbank Plains (4 lane urban road standard) from Keidges Road and Kruger Parade.
$11.7M$5.8M$17.4MPDF p.3 ↗
Redbank Plains Road Upgrade – Stage 4
Upgrade of Redbank Plains Road, Redbank Plains / New Chum / Swanbank (4 lane urban road standard) from Collingwood Drive to Cunningham Highway.
$200k$300k$500kPDF p.3 ↗
Ripley Road and Reif Street Intersection Upgrade
Upgrades at the intersection of Ripley Road and Reif Street, Flinders View.
$750k$1.7M$2.5MPDF p.3 ↗
Ripley Road Upgrade
Upgrade of Ripley Road, Ripley (4 lane urban road standard) from Cunningham Highway and Fischer Road.
$500k$500k$1MPDF p.3 ↗
School Road Upgrade
Upgrade of School Road, Redbank Plains (4 lane urban road standard) from Redbank Plains Road to Alawoona Street.
$500k$1M$1.5MPDF p.3 ↗
Springfield Greenbank Arterial Road Upgrade – Stage 1
Upgrade of Springfield Greenbank Arterial, Springfield Central (4 lane urban road standard) from Eden Station Drive to Sinnathamby Boulevard.
$14.7M$12.2M$27MPDF p.3 ↗
Springfield Parkway Road Upgrade – Stage 1
Upgrade of Springfield Parkway, Springfield (4 lane urban road standard) from Centenary Highway to Hymba Yumba Independent School and; Springfield Greenbank Arterial, Springfield (4 lane urban road standard) from Springfield Parkway to Eden Station Drive.
$9M$9MPDF p.3 ↗
Springfield Parkway Road Upgrade – Stage 2
Upgrade of Springfield Parkway, Springfield (4 lane urban road standard) from Topaz Road to Hymba Yumba Independent School.
$2M$3M$5MPDF p.3 ↗
Toongarra Road Upgrade
Upgrade of Toongarra Road, Leichhardt (4 lane urban road standard) from Old Toowoomba Road to Samford Road.
$200k$400k$600kPDF p.3 ↗
Wulkuraka Connection and Keswick Road Intersection Upgrade
Upgrade of the intersection of Wulkuraka Connection Road, Keswick Road and Butterfield Road, Karrabin including traffic signals.
$150k$1M$1.1MPDF p.3 ↗
Strategic Transport Total$42.4M$26.1M$19.4M$88M

Road Safety and Operations

Project2023–20242024–20252025–20263 Year TotalSource
iGO Intelligent Transport Systems (ITS) Strategy Implementation
The iGO ITS Strategy Implementation 'Unallocated Budget' used for citywide improvements to council's road based technology.
$71k$76k$77k$224kPDF p.3 ↗
iGO Road Safety Action Plan Implementation
The iGO Road Safety Action Plan 'Unallocated Budget' used for citywide safety improvements to council's road network.
$71k$76k$77k$224kPDF p.4 ↗
Minor Improvements – Road Safety and Operations
Road Safety and Operations Minor Improvements Unallocated Budget is typically used for reactive, citywide, minor safety and operational improvements to council's transport network. Projects are typically identified through the Service Request Process or routine inspections.
$50k$60k$60k$170kPDF p.4 ↗
Refuse Vehicle Turnaround Facilities
Upgrade to existing turnaround facilities to accommodate refuse vehicles and eliminate the need for reversing.
$23k$23kPDF p.4 ↗
Road Safety Concept Design
Conceptual design budget allocation for future projects. Projects to be identified during future capital budget development with support from the Sub Program Project Prioritisation List.
$33k$40k$40k$113kPDF p.4 ↗
Signs and Lines
Unallocated citywide budget focused on reactive signage and linemarking requests that are generally received by the Service Request Process.
$135k$140k$140k$415kPDF p.4 ↗
Traffic Signal Modifications and Improvements
Unallocated budget is used for reactive, unplanned, citywide traffic signal improvements.
$126k$131k$132k$389kPDF p.4 ↗
Unallocated Road Safety and Operations Projects
This unallocated budget is used for road safety and operations projects that are implemented as a result of road safety audit recommendations.
$100k$100kPDF p.4 ↗
Road Safety and Operations Total$509k$523k$626k$1.7M

Sustainable Travel

Project2023–20242024–20252025–20263 Year TotalSource
Brassall Bikeway – Stage 6a
Installation of a commuter bikeway from Brassall Bikeway Stage 1 at WM Hughes Street, North Ipswich to the existing riverbank pathway at the Riverlink Shopping Centre.
$1M$1MPDF p.4 ↗
Brassall Bikeway – Stage 6b
Installation of a commuter bikeway lift from the existing riverbank pathway at the Riverlink Shopping Centre to the Bradfield Bridge, North Ipswich.
$200k$200kPDF p.4 ↗
Brassall Bikeway Data Counters
Installation of 6 permanent data counters at various locations along the Brassall Bikeway/ Brisbane Valley Rail Trail to better monitor path usage and trends.
$170k$170kPDF p.4 ↗
Bremer Street Footpath – Stage 2
Installation of a new 2.5m wide shared path/ boardwalk in the northern verge from Bell Street to Ellenborough Street, Ipswich.
$347k$347kPDF p.4 ↗
Bremer Street Footpath – Stage 4
Installation of a pedestrian refuge crossing on Bremer Street adjacent to the Olga Street roundabout, Ipswich.
$10k$10kPDF p.4 ↗
Cycle Safety and Mobility Improvement Program
Cycle Safety and Mobility Improvement Program.
$68k$75k$100k$243kPDF p.4 ↗
Deebing Creek Bikeway – Stage 1
Council is planning to install the Deebing Creek Bikeway (Stage 1) along Barker Street and Thorn Street between Warwick Road and South Street, Ipswich.
$100k$100kPDF p.4 ↗
Foote Lane Active Transport Action Plan (ATAP) Footpath
Continuation of the existing shared treatment on Foote Lane, Ipswich, from current end point to Limestone Street.
$30k$30kPDF p.4 ↗
Gordon Street ATAP Footpath
Upgrade the existing footpath, comply with disability standards, construct new full verge footpath whilst improving visual amenity between Brisbane Street and Limestone Street.
$25k$25kPDF p.4 ↗
iGO ATAP Implementation Forward Design
This funding is used to develop concept design plans for future projects under the iGO ATAP Implementation sub-program for future budgets.
$56k$70k$70k$196kPDF p.4 ↗
iGO Public Transport Action Plan
Construction projects that are aligned with the iGO Public Transport Advocacy and Action Plan.
$50k$150k$100k$300kPDF p.4 ↗
Ipswich City Centre Bikeway – Stage 1
Installation of a commuter bikeway from the intersection of Thorn Street and South Street to East Street and South Street, Ipswich.
$75k$75k$150kPDF p.5 ↗
Ipswich City Centre Bikeway – Stage 2
Installation of a commuter bikeway from the intersection of South and Nicholas Street to Roderick and Omar Street via Limestone Street, Ipswich.
$75k$75k$150kPDF p.5 ↗
Keidges Road ATAP Footpath
Installation of 3.0m wide footpath, appropriate kerb ramps, tree planting and landscaping on the western verge of Keidges Road between Lillian Street and Cudgee Street, Redbank Plains.
$600k$600kPDF p.5 ↗
Mansfield Place ATAP Footpath
Upgrade existing footpath and kerb ramps to comply with Disability Discrimination Act 1992 and improve visual amenity from East Street to Bell Street, Ipswich.
$15k$20k$35kPDF p.5 ↗
Olga Street ATAP Footpath
Continuation of the 1.5m wide footpath on the western verge of Olga Street and upgrade of existing pedestrian refuge/kerb ramps on the southern leg of the roundabout.
$20k$20kPDF p.5 ↗
Pedestrian Safety Improvements
Reactive pedestrian safety improvement projects identified through council's internal and external Service Request Process.
$182k$186k$187k$555kPDF p.5 ↗
Public Transport Disability Improvement Program
Upgrades to existing bus stops to comply with the Disability Discrimination Act 1992 .
$410k$450k$450k$1.3MPDF p.5 ↗
Queen Victoria Parade Bikeway
Installation of a commuter bikeway linking the Chermside Road to existing Limestone Street shared pathway.
$400k$400kPDF p.5 ↗
Sustainable Travel Forward Design Budget Allocation
Forward design for future projects within the Sustainable Travel program.
$25k$30k$55kPDF p.5 ↗
Tulmur Place End of Trip Facility
Construction of a small publicly accessible end of trip facility located in the Tulmur Place carpark adjacent to the Bradfield Bridge. The facility includes provision for increased lighting and security, bicycle and e-scooter parking and e-charging facilities.
$235k$235kPDF p.5 ↗
Willow Road ATAP Footpath – Stage 1
Installation of a 1.5m wide footpath, appropriate kerb ramps, tree planting and landscaping on the southern verge of Willow Road between #123–127 Willow Road and Keidges Road.
$5k$75k$80kPDF p.5 ↗
Willow Road ATAP Footpath – Stage 2
Installation of a 3.0m wide footpath, appropriate kerb ramps, tree planting and landscaping on the northern verge of Willow Road between the Goodna Creek Bikeway and Keidges Road.
$5k$250k$255kPDF p.5 ↗
Sustainable Travel Total$1.7M$1.8M$3M$6.5M

Flood Mitigation And Drainage — total $3.8M

Flood Mitigation

Project2023–20242024–20252025–20263 Year TotalSource
Citywide Flood Impact Design
Preliminary design of flooding hotspots identified across the city.
$100k$100k$100k$300kPDF p.5 ↗
Citywide Flood Impacted Property Acquisitions
Flood impacted properties buy back scheme as per the Bremer River Integrated Catchment Study.
$200k$200kPDF p.5 ↗
Marburg Detention Basin Upgrade
Upgrade to the Marburg detention basin to meet the flood capacity requirement.
$100k$100k$1.5M$1.7MPDF p.5 ↗
Flood Mitigation Total$200k$200k$1.8M$2.2M

Local Drainage

Project2023–20242024–20252025–20263 Year TotalSource
Arthur Summervilles Road Drainage Improvements
Improvements to existing stormwater drainage system to redirect overland stormwater flows away from existing dwellings.
$243k$243kPDF p.6 ↗
Bellbird Park Stormwater Drainage Improvements
Upgrade of existing stormwater drainage network on Perdita Street, Katandra Court and Rosemary Street, Bellbird Park.
$50k$100k$150kPDF p.6 ↗
Lobley Park / Glode Avenue Drainage Improvements
Upgrade of the stormwater drainage network adjacent to Lobley Park and Glode Avenue, Churchill.
$50k$100k$150kPDF p.6 ↗
Minor Stormwater Drainage Improvement Projects
Undertake minor stormwater drainage improvements based on reactive requirements from service requests.
$60k$60k$120kPDF p.6 ↗
Parcell and Holt Street Drainage Improvements
Undertake stormwater drainage improvements through Brassall Grove Unit Complex on Parcell Street, Brassall.
$600k$600kPDF p.6 ↗
Parker Avenue Stormwater Drainage
Improvements to the existing stormwater drainage network on Parker Avenue, Ipswich.
$150k$150kPDF p.6 ↗
Redbank Plains Road Drainage Improvements
Upgrade of the stormwater drainage network adjacent Redbank Plains Road, Goodna.
$50k$100k$150kPDF p.6 ↗
Local Drainage Total$1.2M$360k$1.6M

Parks, Sports And Environment — total $25.3M

Strategic Parks and Sports

Project2023–20242024–20252025–20263 Year TotalSource
Box Flat Memorial Park Pathway
Installation of a new pathway to the Box Flat Memorial, Swanbank.
$20k$20kPDF p.6 ↗
Compliance, Safety and Improvements to Strategic Parks
Budget allocation is for minor compliance or safety improvements to council's assets based on inspections and service requests within Strategic Parks.
$52k$54k$56k$162kPDF p.6 ↗
Council Swim Centres Disability Discrimination Act 1992 Compliance
Forward investigation/design budget to review, identify and scope disability improvements to council's aquatic facilities.
$50k$100k$150kPDF p.6 ↗
Ironbark Park Clubhouse
Council is planning to install a new club house building at Ironbark Park, Ripley South.
$1.6M$1.6MPDF p.6 ↗
Ivor Marsden Memorial Sports Centre Sports Field Lighting Upgrade
Upgrade of sports field lighting on Baxter Oval, Ivor Marsden Memorial Sports Centre to ensure compliance with cricket standards.
$1M$1MPDF p.6 ↗
Jim Donald Parklands Future Clubhouse
Installation of a clubhouse and ancillary infrastructure for Jim Donald Parklands, Silkstone.
$1.1M$1.1MPDF p.6 ↗
Kholo Gardens New Retaining Wall
Installation of a retaining wall to protect the embankment and historic brick water wells in Kholo Gardens, Muirlea.
$250k$250kPDF p.6 ↗
Limestone Park Carpark Extension (southern corner)
Formalisation of an existing gravel car park near the netball courts in Limestone Park, Ipswich.
$50k$50k$100kPDF p.6 ↗
Limestone Park New Dog Off Leash Area
Installation of new dog off-leash area in Limestone Park, Ipswich.
$10k$200k$210kPDF p.6 ↗
Limestone Park New Toilets
Installation of new amenities facility within Limestone Park, Ipswich.
$20k$250k$270kPDF p.6 ↗
Limestone Park Top Carpark Lighting – Stage 2
Installation of new car park lighting to the Whyte Family Clubhouse, Selwyn Edwards Drive, Ipswich.
$270k$270kPDF p.6 ↗
Montello Circuit, Spring Lake Park Toilet
Installation of a new toilet at Spring Lake Park, Springfield Lakes (adjacent to Montello Circuit).
$50k$50kPDF p.6 ↗
Queens Park Healing Place
Installation of a memorial/healing place at Queens Park, Ipswich as part of the Ipswich City Council Indigenous Accord 2020–2025.
$50k$350k$400kPDF p.6 ↗
Redbank Plains Recreation Reserve Carpark Extension
Expansion of the car park near the existing library site within the Redbank Plains Recreation Reserve.
$127k$350k$477kPDF p.6 ↗
Redbank Plains Recreation Reserve Internal Road Lighting
Installation of additional street lighting within the Redbank Plains Recreation Reserve, Redbank Plains.
$430k$430kPDF p.7 ↗
Robelle Domain Fencing
Installation of new fencing (vehicle deterrents) within Robelle Domain, Springfield Central.
$182k$182kPDF p.7 ↗
Rosewood Aquatic Centre Facility Upgrades
Upgrade the Rosewood Aquatic Centre as an outcome of the Aquatic Facilities Action Plan.
$150k$150kPDF p.7 ↗
Tivoli Sporting Complex Lighting to Oval A (Baseball Diamond)
Installation of new sports field lighting to Oval A at the Tivoli Sporting Complex, Tivoli.
$50k$50kPDF p.7 ↗
Strategic Parks and Sports Total$3.3M$2.9M$776k$6.9M

Developer Funded Parks

Project2023–20242024–20252025–20263 Year TotalSource
Cameron Park Upgrades including Playground
Installation of a new playground in Cameron Park, Booval.
$500k$500k$1MPDF p.7 ↗
Goupong Park Upgrades including Playground
Preliminary concept design to inform the upgrade of Goupong Park to a District Recreation Park.
$20k$30k$50kPDF p.7 ↗
Jack Barkley Park Pathway Lighting
Installation of new pathway lighting within Jack Barkley Park, North Booval.
$25k$25kPDF p.7 ↗
Redbank Plains Recreation Reserve New Sports Facility
Installation of new sports fields, clubhouse and carpark within Redbank Plains Recreation Reserve, Redbank Plains.
$250k$250kPDF p.7 ↗
Developer Funded Parks Total$500k$520k$305k$1.3M

Local Parks and Sports

Project2023–20242024–20252025–20263 Year TotalSource
BMX Track (Willey Street Park) Canteen and Amenities Upgrade
Installation of a new canteen, pathways, toilets and storage within the Willey Street Park, Ipswich.
$1.5M$1.5MPDF p.7 ↗
Brittains Road Cricket Pitch
Installation of new cricket pitch and associated works on Brittains Road, Bellbird Park.
$50k$50kPDF p.7 ↗
Caledonian Park Sports Facilities Expansion
Installation of new sports fields, clubhouse and carpark at Caledonian Park, Thagoona.
$250k$250kPDF p.7 ↗
Camira Recreation Reserve Sport Field Irrigation
Installation of irrigation to the sporting fields at Camira Recreation Reserve, Camira.
$300k$300kPDF p.7 ↗
Compliance, Safety and Improvements to Local Parks
Budget allocation is for minor compliance or safety improvements to council's assets based on inspections and service requests within Local Parks.
$52k$54k$56k$162kPDF p.7 ↗
Fernbrooke Sports Field Clubhouse
Installation of a new clubhouse to be located within the Fernbrooke Sports Field, Redbank Plains.
$50k$50kPDF p.7 ↗
Fernbrooke Sports Field Lighting
Installation of new sports field lighting at Fernbrooke Sports Fields, Redbank Plains.
$782k$782kPDF p.7 ↗
Local Bushland Reserve Improvements
Budget allocation is for improvements to existing bushland reserves across the city. These improvements will include upgrades to tracks, access, installation of bike deterrents and fencing and signage.
$52k$54k$56k$162kPDF p.7 ↗
Park Fencing/ Bollarding Projects
Provide fencing and bollards to various parks across the city.
$25k$50k$75kPDF p.7 ↗
Park Pathway Lighting Projects
Provide pathway lighting to various parks across the city.
$50k$50kPDF p.7 ↗
Park Pathway Projects
Provide concrete pathways in various parks across the city.
$25k$50k$75kPDF p.7 ↗
Richardson Park Upgrades including Playground
Extension to the existing playground area in Richardson Park, Goodna.
$630k$630k$1.3MPDF p.8 ↗
Silver Jubilee Sports Facility Clubhouse
Installation of a new clubhouse to be located within the Silver Jubilee Sports Facility, Springfield Central.
$1.6M$1.6MPDF p.8 ↗
Local Parks and Sports Total$3.1M$2.7M$512k$6.3M

Natural Environment And Stormwater

Project2023–20242024–20252025–20263 Year TotalSource
61 Workshop Street Ephemeral Wetlands
Installation of an ephemeral wetlands at 61 Workshop Street, Brassall.
$70k$70k$140kPDF p.8 ↗
Banksia Drive Ephemeral Wetlands
Installation of ephemeral wetlands at Banksia Drive, Raceview.
$60k$70k$130kPDF p.8 ↗
Bremervale Park Upgrade Constructed Wetlands
Installation of a new ephemeral wetlands at Bremervale Park, Bundamba.
$180k$320k$500kPDF p.8 ↗
Creek Street Stormwater Improvement
Installation of small ephemeral wetlands at Creek Street, Bundamba.
$60k$70k$130kPDF p.8 ↗
Grace Street Channel Naturalisation
Installation of ephemeral wetlands and channel naturalisation adjacent Grace Street, Wulkuraka.
$70k$70kPDF p.8 ↗
Harry Ratnam Wetlands
Installation of an ephemeral wetlands in Harry Ratnam Park, Redbank Plains.
$200k$500k$700kPDF p.8 ↗
Heit Family Park Wetlands and Naturalisation
Installation of ephemeral wetlands and channel naturalisation at Heit Family Park, Willowbank.
$60k$60kPDF p.8 ↗
Ironpot Creek Bank Stabilisation – Stage 3
Stabilisation of a section of Ironpot Creek, Pine Mountain – Stage 3 of 4.
$260k$540k$800kPDF p.8 ↗
Pan Pacific Peace Gardens Floodplain Wetlands
Installation of a floodplain wetlands at the Pan Pacific Gardens, Redbank.
$70k$100k$170kPDF p.8 ↗
Riverview Transfer Station Channel Naturalisation
Naturalisation of the existing concrete drain adjacent to Riverview Transfer Station, Riverview.
$70k$70k$140kPDF p.8 ↗
Stormwater Street Tree Pilot
Installation of water smart street trees at various locations across the city.
$52k$54k$56k$162kPDF p.8 ↗
Natural Environment And Stormwater Total$692k$1.7M$566k$3M

Enviroplan

Project2023–20242024–20252025–20263 Year TotalSource
Enviroplan Unallocated Budget
Unallocated budget for improvements to Conservation Estates and Reserves. Projects vary from signage, to trail upgrades, to fencing.
$960k$465k$475k$1.9MPDF p.8 ↗
White Rock Spring Mountain Conservation Estate White Rock Boardwalk and Lookout Projects
Installation of a boardwalk and lookouts within the White Rock – Spring Mountain Conservation Estate, White Rock.
$2M$2MPDF p.8 ↗
Enviroplan Total$960k$465k$2.5M$3.9M

Ipswich Nature Centre

Project2023–20242024–20252025–20263 Year TotalSource
Ipswich Nature Centre Improvements
Minor improvements to the Ipswich Nature Centre with Queens Park, Ipswich.
$52k$62k$67k$181kPDF p.8 ↗
Ipswich Nature Centre Upgrade
Major upgrade of rehabilitation enclosures, biosecurity area and the staff hub.
$150k$500k$500k$1.1MPDF p.8 ↗
Ipswich Nature Centre Total$202k$562k$567k$1.3M

Waterway Recovery

Project2023–20242024–20252025–20263 Year TotalSource
Bremer River Streambank Rehabilitation
Rehabilitation of eroded streambanks in the Bremer River, following the February 2022 flood events.
$55k$248k$303kPDF p.9 ↗
Bremer River V-Notch Gauging Weir Fish Barrier Remediation
Remediation works to a priority fish barrier in the Bremer River at Walloon to restore connectivity.
$55k$55kPDF p.9 ↗
Bundamba Creek Streambank Rehabilitation
Rehabilitation of eroded streambanks in Bundamba Creek, following the February 2022 flood events.
$237k$237kPDF p.9 ↗
Deebing Creek Sediment Removal and Habitat Reinstatement
Removal of sediment and reinstate aquatic habitat in Deebing Creek, Ipswich.
$55k$55kPDF p.9 ↗
Kholo Bridge Reserve Launch and Access Point
Formalisation of a paddle craft access point to the Brisbane River at Kholo Bridge, Muirlea.
$55k$55kPDF p.9 ↗
Warrill Creek Fish Barrier Remediation
Remediation works to a priority fish barrier in Warrill Creek at Purga to restore connectivity.
$220k$220kPDF p.9 ↗
Waterway Education Signage
Installation of new educational signage around the city's waterways, to increase community engagement and awareness.
$5k$5kPDF p.9 ↗
Waterway Recovery Total$292k$275k$363k$930k

Ti Tree Bioenergy Funded

Project2023–20242024–20252025–20263 Year TotalSource
Ti Tree Projects
Ti Tree Bioenergy funds are to be utilised expressly for the purposes of community and environmental benefit and to offset any impacts from the facility.
$750k$420k$450k$1.6MPDF p.9 ↗
Ti Tree Bioenergy Funded Total$750k$420k$450k$1.6M

Local Amenity — total $12.5M

Kerb and Channel

Project2023–20242024–20252025–20263 Year TotalSource
Albert Street Kerb and Channel
Installation of kerb and channel on Albert Street, Goodna, from Alice Street to its southern end adjacent 73 Albert Street.
$35k$220k$255kPDF p.9 ↗
Alexandra Street Kerb and Channel
Installation of kerb and channel on Alexandra Street, Booval, between Clifton Street and the northern end.
$500k$500kPDF p.9 ↗
Alfred Street Kerb and Channel
Installation of kerb and channel on Alfred Street, Riverview, from adjacent 53 Alfred Street to its western end.
$115k$115kPDF p.9 ↗
Blackwood Avenue Kerb and Channel
Installation of kerb and channel on Blackwood Avenue, North Ipswich.
$610k$610kPDF p.9 ↗
Brisbane Road Kerb and Channel
Installation of kerb and channel on Brisbane Road, Redbank, between Brick Street and Cole Street.
$150k$150kPDF p.9 ↗
Cemetery Road Kerb and Channel
Installation of kerb and channel on Cemetery Road, Ipswich, from Briggs Road to its western end, including remaining segment on Carr Street.
$410k$410kPDF p.9 ↗
Chermside Road Kerb and Channel
Installation of new kerb and channel on Chermside Road, Basin Pocket, from McGill Street to its northern end.
$450k$450k$900kPDF p.10 ↗
Downs Street Kerb and Channel
Installation of kerb and channel on Downs Street, North Ipswich, between Ferguson Street and Delacy Street.
$210k$210kPDF p.10 ↗
Giza Court Kerb and Channel
Installation of kerb and channel on Giza Court, Camira, from Elysian Crescent to its southern end.
$6k$6kPDF p.10 ↗
Lowry Lane Kerb and Channel
Installation of kerb and channel on Lowry Lane, North Ipswich, between Colvin Street and Downs Street, including remaining segments on Colvin Street and Downs Street between Lowry Land and Flint Street.
$60k$60kPDF p.10 ↗
Moores Pocket Road Kerb and Channel
Installation of kerb and channel on Moores Pocket Road, Moores Pocket, from Boundary Street to its eastern end.
$100k$150k$250kPDF p.10 ↗
Naomai Street Kerb and Channel
Installation of kerb and channel on Naomai Street, Blackstone, from Charlotte Street to its northern end adjacent 91 Naomai Street.
$50k$50kPDF p.10 ↗
Newman Street Kerb and Channel
Installation of kerb and channel on Newman Street, Gailes.
$50k$50kPDF p.10 ↗
Power Street Kerb and Channel
Installation of kerb and channel on Power Street, North Ipswich, including segments of Harrison Street and Parker Lane.
$50k$50kPDF p.10 ↗
Railway Street Kerb and Channel
Installation of kerb and channel on Railway Street, Rosewood, between John Street and Matthew Street, including remaining segment of Matthew Street.
$40k$40kPDF p.10 ↗
River Road Kerb and Channel
Installation of kerb and channel on River Road, Bundamba, from Mary Street to its northern end adjacent 35 River Road.
$30k$30kPDF p.10 ↗
Robinson Street Kerb and Channel
Installation of kerb and channel on Robinson Street, Brassall, from Barkell Street to its southern end.
$50k$50kPDF p.10 ↗
Salisbury Road Kerb and Channel
Installation of kerb and channel on Salisbury Road, Ipswich, from Macalister Street to its western end.
$915k$915kPDF p.10 ↗
Scott Street Kerb and Channel
Installation of kerb and channel on Scott Street, Goodna, from Smiths Road to its northern end.
$43k$43kPDF p.10 ↗
Short Street Kerb and Channel
Installation of new kerb and channel on Short Street from Railway Street to Haigslea Amberley Road, Walloon.
$1.9M$1.9MPDF p.10 ↗
Smith Street Kerb and Channel
Installation of kerb and channel on Smith Street, North Ipswich, from Pine Mountain Road to its southern end adjacent 38 Smith Street.
$190k$190kPDF p.10 ↗
Smiths Road Kerb and Channel
Installation of kerb and channel on Smiths Road, Goodna, between Arne Street and William Street.
$40k$40kPDF p.10 ↗
Springall Street Kerb and Channel / Stormwater Drainage
Installation of new stormwater drainage infrastructure on Springall Street, Basin Pocket.
$480k$480kPDF p.10 ↗
Stanley Street Kerb and Channel
Installation of kerb and channel on Stanley Street, Goodna, from Stuart Street to Albert Street.
$620k$620kPDF p.10 ↗
Stuart Street Kerb and Channel
Installation of kerb and channel on Stuart Street, Goodna, between Smiths Road and Alice Street.
$50k$50kPDF p.10 ↗
William Street Kerb and Channel
Installation of kerb and channel on William Street, Goodna, between Alice Street and Barram Street.
$150k$100k$250kPDF p.10 ↗
Willow Road Kerb and Channel
Installation of kerb and channel on Willow Road, Redbank Plains, between Renee Street and Redbank Plains State High School.
$50k$50kPDF p.10 ↗
Woogaroo Street Kerb and Channel
Installation of kerb and channel on Woogaroo Street, Goodna, from Lower Stuart Street to its eastern end adjacent 5 Woogaroo Street.
$150k$150k$300kPDF p.10 ↗
Kerb and Channel Total$878k$1.6M$6.2M$8.6M

Provisional Projects

Project2023–20242024–20252025–20263 Year TotalSource
Provisional Project Budget
Budget allocation is for projects that are identified and raised as the year progresses.
$840k$530k$540k$1.9MPDF p.11 ↗
Provisional Projects Total$840k$530k$540k$1.9M

Sealed Gravel Roads

Project2023–20242024–20252025–20263 Year TotalSource
Borallon Station Road Upgrade
Upgrade Borallon Station Road to a sealed rural road standard.
$30k$30kPDF p.11 ↗
Riverside Drive Upgrade – Stage 1
Upgrade Riverside Drive from Kholo Botanic Gardens to Sherlocks Road to a sealed rural road standard.
$100k$102k$202kPDF p.11 ↗
Sealed Gravel Roads Total$130k$102k$232k

Unmaintained Gravel Roads

Project2023–20242024–20252025–20263 Year TotalSource
Cummings Road Gravel Road Upgrade
Upgrade the existing unmaintained gravel road to a maintained standard on Cummings Road, Calvert.
$107k$107kPDF p.11 ↗
Ferling Road Gravel Road Upgrade
Upgrade the existing unmaintained gravel road to a maintained standard on Ferling Road, Calvert.
$148k$148kPDF p.11 ↗
Hedricks Road Gravel Road Upgrade
Upgrade the existing unmaintained gravel road to a maintained standard on Hedricks Road, Mount Forbes.
$100k$100kPDF p.11 ↗
Huth Road Gravel Road Upgrade
Upgrade the existing unmaintained gravel road to a maintained standard on Huth Road, Ironbark.
$75k$75kPDF p.11 ↗
Schultzs Road Gravel Road Upgrade
Upgrade the existing unmaintained gravel road to a maintained standard on Schultzs Road, Ironbark.
$143k$143kPDF p.11 ↗
Verrenkamp Road Gravel Road Upgrade
Upgrade the existing unmaintained gravel road to a maintained standard on Verrenkamp Road, Redbank Plains.
$200k$200kPDF p.11 ↗
Unmaintained Gravel Roads Total$275k$248k$250k$773k

Urban Greening

Project2023–20242024–20252025–20263 Year TotalSource
Root Barrier Restoration
Installation of tree root barrier around existing street trees that are impacting on or will impact on other council and private assets.
$165k$173k$195k$533kPDF p.11 ↗
Tree Protection Zone Improvements
Installation of fencing and timber bollards adjacent to existing trees to prevent vehicular damage to the exposed tree roots.
$126k$130k$155k$411kPDF p.11 ↗
Urban Greening Total$291k$303k$350k$944k

Corporate Facilities — total $450k

Facility Upgrades

Project2023–20242024–20252025–20263 Year TotalSource
Ipswich Civic Centre Forecourt Upgrade
Undertake forecourt upgrades including additional weather protection and shade at Ipswich Civic Centre, Ipswich.
$450k$450kPDF p.12 ↗
Facility Upgrades Total$450k$450k

Asset Rehabilitation — total $95.6M

Bridge and Culvert Rehabilitation

Project2023–20242024–20252025–20263 Year TotalSource
Adelong Avenue Culvert Rehabilitation
Replacement of the stormwater drainage culvert on Adelong Avenue, Thagoona.
$500k$450k$950kPDF p.12 ↗
Bergins Hill Road Culvert Rehabilitation
Culvert rehabilitation works on Bergins Hill Road, Bundamba.
$20k$85k$105kPDF p.12 ↗
Bundamba Creek Bridge Rehabilitation
Rehabilitation of Bundamba Creek bridge abutment protection on Ripley Road, South Ripley.
$30k$30kPDF p.12 ↗
Carmichaels Road Floodway Upgrade
Floodway rehabilitation works on Carmichaels Road, Purga.
$10k$10kPDF p.12 ↗
Elaine Street Stormwater Drainage Relining
Culvert rehabilitation works on Elaine Street, Karalee.
$40k$40kPDF p.12 ↗
Fawkner Crescent Stormwater Drainage Relining
Culvert rehabilitation works on Fawkner Crescent, Barellan Point.
$35k$35kPDF p.12 ↗
Hancock Bridge Barrier Replacement
Replacement of the Hancock Bridge barriers, on Albion Street and Kingsmill Road.
$900k$900kPDF p.12 ↗
Hanlon Street Stormwater Drainage Relining
Culvert rehabilitation works on Hanlon Street, Bundamba.
$35k$35kPDF p.12 ↗
Harold Summervilles Road Stormwater Drainage Relining
Culvert rehabilitation works on Harold Summervilles Road, Karalee.
$70k$70kPDF p.12 ↗
Hiddenvale Road Bridge Replacement
Replacement of the Hiddenvale Road/ Tom Kerle Bridge, Calvert.
$4.7M$4.7MPDF p.12 ↗
High Street Stormwater Drainage Relining
Culvert rehabilitation works on High Street, Brassall.
$35k$35kPDF p.12 ↗
Kruger Parade Stormwater Drainage Relining
Culvert rehabilitation works on Kruger Parade, Redbank.
$80k$80kPDF p.12 ↗
Lower William Street Stormwater Drainage Relining
Culvert rehabilitation works on Lower William Street, Goodna.
$90k$90kPDF p.12 ↗
Mary Street Footbridge
Replacement of the existing footbridge on Mary Street, Bundamba.
$10k$10kPDF p.12 ↗
Michel Street Footbridge Replacement
Replacement of the existing footbridge on Michel Street, Ripley.
$375k$375kPDF p.12 ↗
Mill Street Footbridge
Replacement of the existing footbridge on Mill Street, Rosewood.
$50k$50kPDF p.12 ↗
Mount Walker West Road Stormwater Drainage Relining
Culvert rehabilitation works on Mount Walker West Road, Lower Mount Walker.
$145k$145kPDF p.12 ↗
Mt. Flinders Road Floodway Rehabilitation
Floodway rehabilitation works on Mount Flinders Road, Peak Crossing.
$10k$90k$100kPDF p.12 ↗
Pine Mountain Road Stormwater Drainage Relining
Culvert rehabilitation works on Pine Mountain Road, Brassall.
$65k$65kPDF p.12 ↗
Purga School Road Bridge Replacement
Replacement of the Purga School Road Bridge, Purga.
$500k$500kPDF p.12 ↗
Railway Street Stormwater Drainage Relining
Culvert rehabilitation works on Railway Street, Rosewood.
$40k$40kPDF p.13 ↗
Shanahan Parade Footbridge
Replacement of the existing footbridge on Shanahan Parade, Redbank Plains.
$230k$230kPDF p.13 ↗
Tallegalla Road Culvert Rehabilitation
Culvert rehabilitation works to the Tallegalla Road Culvert Crossing, Tallegalla.
$935k$935kPDF p.13 ↗
Bridge and Culvert Rehabilitation Total$5.2M$3.1M$1.2M$9.5M

Disturbed Land Management

Project2023–20242024–20252025–20263 Year TotalSource
Borallon Closed Landfill Remediation
Rehabilitation of closed landfill site at Borallon.
$40k$900k$940kPDF p.13 ↗
Disturbed Land Site Compliance Works
Reactive projects identified through routine investigations/inspections of council owned historic landfill and mine sites.
$52k$52k$54k$158kPDF p.13 ↗
Environmental Monitoring Infrastructure
Installation of telemetry monitoring systems at disused landfill sites to monitor underground gases.
$20k$20k$20k$60kPDF p.13 ↗
Jane Street Historical Landfill Remediation
Rehabilitation of the historical landfill site on Jane Street, Leichhardt.
$100k$100kPDF p.13 ↗
Lanefield Closed Landfill Remediation
Rehabilitation of the closed landfill site at Lanefield.
$10k$50k$60kPDF p.13 ↗
Whitwood Road (South) Historical Landfill Remediation
Rehabilitation of the Whitwood Road (South) Historical Landfill site, at New Chum, by capping and stormwater drainage works.
$900k$900kPDF p.13 ↗
Woogaroo Closed Landfill Leachate and Gas Management
Installation of leachate and gas management infrastructure at the Woogaroo closed landfill site, Goodna.
$100k$100kPDF p.13 ↗
Disturbed Land Management Total$172k$1M$1.1M$2.3M

Drainage Rehabilitation

Project2023–20242024–20252025–20263 Year TotalSource
Bergins Hill Road Drainage Channel Rehabilitation
Rehabilitation of existing stormwater drainage channel on Bergins Hill Road, Bundamba.
$15k$80k$95kPDF p.13 ↗
Blackall Street Drainage Rehabilitation
Rehabilitation of existing stormwater drainage infrastructure on Blackall Street, Ipswich.
$99k$99kPDF p.13 ↗
Chermside Road Drainage Rehabilitation
Rehabilitation of existing stormwater drainage infrastructure and upgrade the outlet structure on Chermside Road, East Ipswich.
$20k$40k$60kPDF p.13 ↗
Colvin Street Drainage Rehabilitation
Rehabilitation of existing stormwater drainage infrastructure on Colvin Street, North Ipswich.
$118k$118kPDF p.13 ↗
Drainage Unallocated Reactive Works
This budget allocation is for reactive stormwater drainage rehabilitation projects that are currently not identified and may be required to be completed as soon as practical.
$500k$500kPDF p.13 ↗
East Ipswich Catchment Drainage Rehabilitation – Stage 1
Undertake stormwater drainage rehabilitation works in the East Ipswich Catchment.
$4.6M$4.6MPDF p.13 ↗
East Ipswich Catchment Drainage Rehabilitation – Stage 2
Rehabilitation of existing stormwater drainage infrastructure in the East Ipswich Catchment – Stage 2.
$2.5M$2.5MPDF p.13 ↗
East Ipswich Catchment Drainage Rehabilitation – Stage 3
Rehabilitation of existing stormwater drainage infrastructure within the East Ipswich Catchment – Stage 3.
$150k$50k$200kPDF p.13 ↗
Ferguson and Gulland Street Drainage Rehabilitation
Rehabilitation of existing stormwater drainage infrastructure on Ferguson and Gulland Street, North Ipswich.
$245k$245kPDF p.13 ↗
Goodwin Street Drainage Rehabilitation
Rehabilitation of existing stormwater drainage infrastructure on Goodwin Street, Basin Pocket.
$22k$22kPDF p.14 ↗
Harlin Road Drainage Rehabilitation
Replacement and rehabilitation of existing stormwater drainage infrastructure on Harlin Road, Coalfalls.
$30k$30kPDF p.14 ↗
Kingsmill Road Drainage Rehabilitation
Rehabilitation of existing stormwater drainage infrastructure on Kingsmill Road, Coalfalls.
$24k$24kPDF p.14 ↗
Lamington Road Drainage Rehabilitation
Rehabilitation of existing stormwater drainage infrastructure on Lamington Road, North Ipswich.
$112k$112kPDF p.14 ↗
Lowry Lane and Colvin Street Drainage Rehabilitation
Replacement of existing stormwater drainage infrastructure on Lowry Lane and Colvin Street, North Ipswich.
$70k$750k$820kPDF p.14 ↗
Pelican Street Drainage Rehabilitation
Rehabilitation of existing stormwater drainage infrastructure on Pelican Street, North Ipswich.
$95k$95kPDF p.14 ↗
Pelican, Canning and Pine Street Drainage Rehabilitation
Rehabilitation of existing stormwater drainage infrastructure on Pelican, Canning and Pine Street, North Ipswich.
$230k$230kPDF p.14 ↗
Pine Mountain Road Drainage Rehabilitation
Rehabilitation of existing stormwater drainage infrastructure on Pine Mountain Road, North Ipswich.
$37k$37kPDF p.14 ↗
Pryde Street and Hume Street Drainage Rehabilitation
Undertake stormwater drainage rehabilitation works to the existing network between Pryde and Hume Streets, Woodend.
$1.2M$1M$2.2MPDF p.14 ↗
Shenton and Ashgrove Street Drainage Rehabilitation
Rehabilitation of existing stormwater drainage infrastructure on Shenton and Ashgrove Street, Coalfalls.
$96k$96kPDF p.14 ↗
W M Hughes Street Drainage Rehabilitation
Rehabilitation of existing stormwater drainage infrastructure on W M Hughes Street, North Ipswich.
$26k$26kPDF p.14 ↗
Woodend Catchment Drainage Rehabilitation – Stage 1
Undertake stormwater drainage rehabilitation and realignment works in the Woodend Catchment – Stage 1 of 7.
$2.3M$2.3MPDF p.14 ↗
Woodend Road Drainage Rehabilitation
Rehabilitation of existing stormwater drainage infrastructure on Woodend Road, Sadliers Crossing.
$89k$89kPDF p.14 ↗
Drainage Rehabilitation Total$35k$8.9M$5.7M$14.6M

Facility Rehabilitation

Project2023–20242024–20252025–20263 Year TotalSource
Cameron Park Amenities Building Rehabilitation
Rehabilitation of the existing amenities building within Cameron Park, Booval.
$275k$275k$550kPDF p.14 ↗
Civic Centre Carpet Renewal
Replacement of existing carpet at the Ipswich Civic Centre.
$140k$140kPDF p.14 ↗
Facilities Air- Conditioning System Replacement Program
Replacement of aging air-conditioning systems.
$100k$100kPDF p.14 ↗
Facilities Rehabilitation Unallocated Budget
Unallocated budget for reactive works being required at council owned and maintained facilities.
$100k$105k$205kPDF p.14 ↗
Ipswich Art Gallery Forecourt Refurbishment
Replacement of the defective floor finishes within the Ipswich Art Gallery forecourt area, Ipswich.
$60k$60kPDF p.14 ↗
Ipswich Civic Centre Foyer Ceiling Rehabilitation
Rehabilitate the foyer ceiling within the Ipswich Civic Centre, Ipswich.
$450k$450kPDF p.14 ↗
Ipswich Civic Centre Gallery Toilets Rehabilitation
Refurbish the existing gallery toilets within the Ipswich Civic Centre, Ipswich.
$450k$450kPDF p.14 ↗
Ipswich Civic Centre Vehicle Access Improvement
Reconstruction of existing vehicular access to the Ipswich Civic Centre, Ipswich.
$50k$50kPDF p.14 ↗
Richardson Park Amenities Building Rehabilitation
Refurbish the existing amenities building and playground within Richardson Park, Goodna.
$275k$275k$550kPDF p.14 ↗
Facility Rehabilitation Total$690k$1.7M$155k$2.6M

Gravel Road Rehabilitation

Project2023–20242024–20252025–20263 Year TotalSource
Gravel Resheeting Program
Reconstruct existing gravel roads across the city. These are based on routine inspections and service requests.
$2.5M$2.6M$5.1MPDF p.15 ↗
Gravel Road Rehabilitation Total$2.5M$2.6M$5.1M

Kerb and Channel Rehabilitation

Project2023–20242024–20252025–20263 Year TotalSource
Argyle Street Kerb and Channel Rehabilitation
Undertake road pavement reconstruction, including kerb and channel on Argyle Street between Henty Drive to Price Street and #40 to #50 Argyle Street, Redbank Plains.
$35k$35kPDF p.15 ↗
Barnes Court Kerb and Channel Rehabilitation
Reconstruct 56m of kerb and channel in cul de sac and rehabilitate the road pavement in Barnes Court, Silkstone.
$20k$150k$170kPDF p.15 ↗
Cross Street Kerb and Channel Rehabilitation
Undertake road pavement reconstruction and kerb and channel works on a section of Cross Street, Raceview.
$197k$500k$697kPDF p.15 ↗
Emery Street Kerb and Channel Rehabilitation
Undertake road pavement reconstruction, including kerb and channel, on Emery Street, Carole Park.
$1.8M$1.8MPDF p.15 ↗
Gladstone Road Kerb and Channel Rehabilitation
Undertake kerb and channel reconstruction on Gladstone Road (between #1 to #21), Sadliers Crossing.
$35k$35kPDF p.15 ↗
Holt Street Kerb and Channel Rehabilitation
Undertake road pavement reconstruction, including a section of kerb and channel replacement on Holt Street (Between Glenelg Drive to end), Brassall.
$30k$30kPDF p.15 ↗
Olive Street Kerb and Channel Rehabilitation
Undertake road pavement rehabilitation works, including a small section of kerb and channel and a gully pit top replacement, on Olive Street, Flinders View.
$100k$100kPDF p.15 ↗
Royal George Lane Kerb and Channel Rehabilitation
Undertake road pavement reconstruction, including kerb and channel on Royal George Lane (John Street to Albert Street), Rosewood.
$40k$40kPDF p.15 ↗
Russell Drive Kerb and Channel Rehabilitation
Undertake road pavement reconstruction, including kerb and channel on Russell Drive (Llewellyn Street to #65), Redbank Plains.
$50k$50kPDF p.15 ↗
Trevlac Street Kerb and Channel Rehabilitation
Undertake road pavement reconstruction, including kerb and channel on Trevlac Street, Rosewood.
$40k$40kPDF p.15 ↗
View Street Kerb and Channel Rehabilitation
Undertake road pavement reconstruction, including kerb and channel on View Street, (Panton Street to #12), Woodend.
$35k$35kPDF p.15 ↗
Waghorn Street Kerb and Channel Rehabilitation
Reconstruct a section of kerb and channel on Waghorn Street, Woodend.
$380k$380kPDF p.15 ↗
York Street Kerb and Channel Rehabilitation
Reconstruct a section of kerb and channel on York Street, East Ipswich.
$20k$25k$45kPDF p.15 ↗
Kerb and Channel Rehabilitation Total$40k$2.5M$915k$3.5M

Parks Rehabilitation

Project2023–20242024–20252025–20263 Year TotalSource
Castle Hill Blackstone Reserve Carpark Refurbishment
Refurbishment of the existing car park at Castle Hill Blackstone Reserve, Blackstone.
$400k$400kPDF p.16 ↗
Grande Park Playground Mountain Slide Replacement
Replacement of the mountain slide and relocate the maintenance access gate at Grande Park, Springfield Lakes.
$20k$400k$420kPDF p.16 ↗
Haig Street Conservation Reserve Bollards
Replacement of the existing timber bollards with recycled plastic bollards at the Haig Street Conservation Reserve, Brassall.
$80k$80kPDF p.16 ↗
Hancock Park Playground Replacement
Replacement of play equipment at Hancock Park, Eastern Heights.
$180k$180kPDF p.16 ↗
Hazelwood Park Pathway
Replacement of the existing pathway to the park and improvement to the stormwater drainage channel at Hazelwood Park, Flinders View.
$25k$200k$225kPDF p.16 ↗
Jane Gorry Park Combination Unit Replacement
Replacement of the combination unit at Jane Gorry Park, Augustine Heights.
$100k$100kPDF p.16 ↗
Leichhardt Park Swing Replacement
Replacement of the swing set at Leichhardt Park, One Mile.
$15k$15kPDF p.16 ↗
Limestone Park Fitness Equipment
Relocation of the existing fitness equipment within Limestone Park, Ipswich.
$100k$100kPDF p.16 ↗
Organic Softfall Replacement
Rehabilitation of existing playground organic/ mulch softfall. These locations are determined from routine playground inspections and by the Service Request Process.
$450k$550k$1MPDF p.16 ↗
Pan Pacific Gardens Boardwalk Replacement
Replacement of a section of timber boardwalk at Pan Pacific Gardens, Redbank.
$25k$25kPDF p.16 ↗
Parks Refurbishment – Unallocated Reactive Works
This budget allocation is for reactive works within parks and identified through our internal and external Service Request Process.
$52k$53k$105kPDF p.16 ↗
Playground Rehabilitation Program
Reactive playground refurbishment works within parks and identified through our internal and external Service Request Process.
$150k$150k$300kPDF p.16 ↗
Queens Park Playground Upgrade
Replacement of the existing playground within Queens Park, Ipswich.
$100k$100kPDF p.16 ↗
Regatta Walk Combo Climber Unit Replacement
Replacement of the climbing unit at the teenage playground section of Regatta Walk, Springfield Lakes.
$180k$180kPDF p.16 ↗
Rex Hawkes Park Dog Off Leash Area Fence Replacement
Reconstruct an existing fence within Rex Hawkes Park, Redbank Plains.
$150k$150kPDF p.16 ↗
Rubber Softfall Replacement
Rehabilitation of existing playground rubber softfall. These locations are determined from routine playground inspections and by the Service Request Process.
$200k$300k$500kPDF p.16 ↗
Springfield Lakes Boardwalk Rehabilitation
Replacement of the existing deteriorating timber boardwalk section at Spring Lake Park, Springfield Lakes.
$50k$50kPDF p.16 ↗
Parks Rehabilitation Total$145k$1.7M$2.1M$3.9M

Path Rehabilitation

Project2023–20242024–20252025–20263 Year TotalSource
255–273 Brisbane Street Footpath Rehabilitation
Replacement of a section of footpath between 255–273 Brisbane Road, West Ipswich.
$310k$310kPDF p.16 ↗
Cemetery Road Footpath Rehabilitation
Replacement of a section of footpath on Cemetery Road, Eastern Heights.
$10k$75k$85kPDF p.16 ↗
Downs Street Footpath Rehabilitation
Replacement of a section of footpath on Downs Street, North Ipswich.
$10k$70k$80kPDF p.16 ↗
MacGregor Street Footpath Rehabilitation
Replacement of a section of footpath on Macgregor Street, Woodend.
$330k$330kPDF p.16 ↗
Prospect Street Footpath Rehabilitation
Replacement of a section of footpath on Prospect Street, Tivoli.
$15k$260k$275kPDF p.17 ↗
Sharpless Road Footpath Rehabilitation
Replacement of a section of footpath on Sharpless Road, Springfield.
$10k$10kPDF p.17 ↗
Tallon Street Footpath Rehabilitation
Replacement of a section of footpath on Tallon Street, Sadliers Crossing.
$10k$170k$180kPDF p.17 ↗
Unallocated Path Rehabilitation Projects
Rehabilitation of existing pedestrian pathways. These locations are determined from routine inspections and by the Service Request Process.
$100k$100k$200kPDF p.17 ↗
Whitehill Road Footpath Rehabilitation
Replacement of a section of footpath on Whitehill Road, Eastern Heights.
$10k$10kPDF p.17 ↗
Path Rehabilitation Total$45k$750k$685k$1.5M

Sealed Road Rehabilitation

Project2023–20242024–20252025–20263 Year TotalSource
Adelong Avenue Road Rehabilitation
Road pavement reconstruction works on various sections of Adelong Avenue, Thagoona.
$80k$1.5M$965k$2.5MPDF p.17 ↗
Albert Street Road Rehabilitation
Road pavement reconstruction works on Albert Street, Rosewood.
$30k$30kPDF p.17 ↗
Augusta Parkway Road Rehabilitation
Road pavement reconstruction works on a section of Augusta Parkway.
$80k$950k$1MPDF p.17 ↗
Brisbane Terrace Road Rehabilitation
Road pavement reconstruction works on Brisbane Terrace (between Weedman Street and Monash Road), Redbank.
$40k$40kPDF p.17 ↗
Brisbane Terrace Road Rehabilitation – Stage 1
Road pavement reconstruction works on Brisbane Terrace (Lower James Street to just east of George Street at culvert), Goodna.
$30k$35k$65kPDF p.17 ↗
Brisbane Terrace Road Rehabilitation – Stage 2
Road pavement reconstruction works on Brisbane Terrace (Lower Cross Street to #235), Goodna.
$25k$25kPDF p.17 ↗
Burgoyne Street Road Rehabilitation
Road pavement reconstruction works on a section of Burgoyne Street (between #19/21 – #37), Bundamba.
$30k$305k$335kPDF p.17 ↗
Campbell Street Road Rehabilitation
Road pavement reconstruction works on Campbell Street, Woodend.
$520k$520kPDF p.17 ↗
Casey Street Road Rehabilitation
Road pavement reconstruction works on Casey Street, Leichhardt.
$1.3M$1.3MPDF p.17 ↗
Cedar Road Rehabilitation – Stage 1
Road pavement reconstruction works on Cedar Road (#81 to #101 Cedar Road), Redbank Plains.
$30k$35k$65kPDF p.17 ↗
Cedar Road Rehabilitation – Stage 2
Road pavement reconstruction works on Cedar Road, Redbank Plains.
$25k$30k$55kPDF p.17 ↗
Cemetery Road Rehabilitation
Road pavement reconstruction works on Cemetery Road (between #3 to Jackes Street), Eastern Heights.
$30k$35k$65kPDF p.17 ↗
Church Street Road Rehabilitation
Road pavement reconstruction works on Church Street, Goodna.
$25k$30k$55kPDF p.17 ↗
Citywide Sealed Road Resurfacing
Undertake citywide road resurfacing to rehabilitate and extend the life of the road asset.
$60k$14.1M$16.1M$30.2MPDF p.17 ↗
Cobalt Street Road Rehabilitation
Road pavement reconstruction works on Cobalt Street (between Boundary Street – #67 To Emery), Carole Park.
$25k$20k$45kPDF p.17 ↗
Collingwood Drive Road Rehabilitation
Road pavement reconstruction works on Collingwood Drive, Collingwood Park.
$25k$25k$50kPDF p.17 ↗
Creek Street Road Rehabilitation
Road pavement reconstruction works on Creek Street (between Mining Street to Factory Entrance to Granville entrance), Bundamba.
$30k$25k$55kPDF p.17 ↗
Dellvene Crescent Road Rehabilitation
Road pavement reconstruction works on Dellvene Crescent, Rosewood.
$30k$30kPDF p.17 ↗
Dowden Street Road Rehabilitation
Road pavement reconstruction works on Dowden Street (a section between Cross Street and Hendron Circuit and a section from Smiths Road to approximately #20 Dowden Street), Goodna.
$690k$690kPDF p.18 ↗
Dudleigh Street Road Rehabilitation
Road pavement reconstruction works on Dudleigh Street, Booval.
$35k$25k$60kPDF p.18 ↗
Enterprise Street Road Rehabilitation
Road pavement reconstruction works on Enterprise Street, Wulkuraka.
$440k$440kPDF p.18 ↗
Grenville Street Road Rehabilitation
Road pavement reconstruction works on Grenville Street, Basin Pocket.
$22k$25k$47kPDF p.18 ↗
Griffith Road Rehabilitation
Road pavement reconstruction works on Griffith Road (2A to 2B Griffith Road to surface change on each end of street), Ipswich.
$15k$35k$50kPDF p.18 ↗
Howard Street Road Rehabilitation
Road pavement reconstruction works on Howard Street, Basin Pocket.
$20k$20k$40kPDF p.18 ↗
Jalrock Place Road Rehabilitation
Road pavement reconstruction works on a section of Jalrock Place (from 9–13 Jalrock Place – Mica Street), Carole Park.
$10k$110k$120kPDF p.18 ↗
Jasmine Street Road Rehabilitation
Road pavement reconstruction works on sections of Jasmine Street (between Grevillea Street and Tamatea Drive), Bellbird Park.
$1.2M$1.2MPDF p.18 ↗
Junction Road Rehabilitation
Road pavement reconstruction works on Junction Road, Karalee.
$60k$30k$90kPDF p.18 ↗
Kingfisher Court Road Rehabilitation
Road pavement reconstruction works on a section of Kingfisher Court (between Lorrikeet Street – northern end), Bundamba.
$15k$157k$172kPDF p.18 ↗
Lansdowne Way Road Rehabilitation
Road pavement reconstruction works on Lansdowne Way, Chuwar.
$45k$45kPDF p.18 ↗
Lobb Street Road Rehabilitation
Road pavement reconstruction works on Lobb Street, Churchill.
$25k$25kPDF p.18 ↗
Mary Street Road Rehabilitation
Road pavement reconstruction works on Mary Street, Blackstone.
$50k$50k$100kPDF p.18 ↗
McInnerney Street Road Rehabilitation
Road pavement reconstruction works on McInnerney Street (between Milgate Street and Lawrie Drive), Redbank Plains.
$295k$295kPDF p.18 ↗
Mica Street Road Rehabilitation
Road pavement reconstruction works on Mica Street, Carole Park.
$50k$35k$85kPDF p.18 ↗
Old Logan Road Rehabilitation
Road pavement reconstruction works on Old Logan Road, Camira.
$20k$200k$220kPDF p.18 ↗
Olive Street Road Rehabilitation
Road pavement reconstruction works, including a small section of kerb and channel and a gully pit top replacement, on Olive Street, Flinders View.
$70k$500k$570kPDF p.18 ↗
Redbank Plains Road Rehabilitation
Road pavement reconstruction works on Redbank Plains Road, Redbank Plains.
$30k$30kPDF p.18 ↗
Reif Street Road Rehabilitation
Road pavement reconstruction works on Reif Street (between Ripley Road to Whitehill Road Roundabout), Flinders View.
$60k$40k$100kPDF p.18 ↗
Smiths Road Rehabilitation
Road pavement reconstruction works on Smiths Road, Goodna.
$40k$40kPDF p.18 ↗
Springfield Lakes Boulevard Road Rehabilitation
Road pavement reconstruction works on Spring Lakes Boulevard, Springfield Lakes.
$20k$20k$40kPDF p.18 ↗
Taloma Avenue Road Rehabilitation
Road pavement reconstruction works on Taloma Avenue, Chuwar.
$20k$20kPDF p.18 ↗
Vivian Street Road Rehabilitation
Road pavement reconstruction works on a section of Vivian Street (between Minnis Street and Frederick Street), Eastern Heights.
$30k$400k$430kPDF p.18 ↗
Whitehill Road Rehabilitation
Road pavement reconstruction works on Whitehill Road (Cascade Street to culvert, south of Pendragon Street), Raceview.
$20k$35k$55kPDF p.18 ↗
Willowtree Drive Road Rehabilitation
Road pavement reconstruction works on a section of Willowtree Drive (between Dianthus Place – # 30 Willowtree Drive), Flinders View.
$20k$825k$845kPDF p.18 ↗
Woodend Road Rehabilitation
Road pavement reconstruction works on Woodend Road, Woodend.
$25k$25k$50kPDF p.18 ↗
Sealed Road Rehabilitation Total$435k$21.2M$20.7M$42.3M

Sports Facility Rehabilitation

Project2023–20242024–20252025–20263 Year TotalSource
Bob Gibbs Park Sports Field Lighting Replacement
Replacement of existing lighting towers and luminaires at Bob Gibbs Oval, Springfield.
$1.4M$1.4MPDF p.19 ↗
Evan Marginson Park Retaining Wall Rehabilitation
Rehabilitation of the existing spectator retaining wall between the netball courts and gym building, including fire exit and boundary fence.
$100k$100kPDF p.19 ↗
George and Eileen Hastings Sports Centre Lighting Replacement
Replacement of existing sports field lighting at the George and Eileen Sports Centre, One Mile.
$29k$29kPDF p.19 ↗
Limestone Park Netball Facilities Court Resurfacing
Resurfacing of existing netball courts at Limestone Park, Ipswich.
$225k$225kPDF p.19 ↗
Limestone Park Netball Facilities Lighting Replacement
Replacement of existing netball court lighting at the Limestone Park, Ipswich.
$925k$925kPDF p.19 ↗
Queens Park Tennis Court Lighting Replacement
Replacement of the lights and poles within the tennis courts in Queens Park, Ipswich.
$600k$600kPDF p.19 ↗
Redbank Plains Recreation Reserve Lighting Replacement
Replacement of existing rugby oval lighting at the Redbank Plains recreation Reserve, Redbank Plains.
$30k$30kPDF p.19 ↗
Southern Sports Field Lighting
Upgrade to existing sports field lighting at the Southern Sports Fields, Springfield Central.
$1.3M$1.3MPDF p.19 ↗
Sports Facility Rehabilitation Projects
Rehabilitation of multiple sites and equipment including; Ivor Marsden cricket nets lighting, Tivoli Cricket Net lighting, Tivoli E/F lighting rectification, Limestone Park cricket net lighting upgrade, Kippen Oval A lighting.
$300k$300k$600kPDF p.19 ↗
Sports Field Lighting – Unallocated Reactive Works
Reactive replacement of non-conforming sports field lighting across the city.
$360k$370k$730kPDF p.19 ↗
Sutton Park Lighting Replacement
Replacement of existing sports field lighting at the Sutton Park, Brassall.
$36k$36kPDF p.19 ↗
Sports Facility Rehabilitation Total$1.4M$2.6M$1.9M$5.9M

Street Furniture Rehabilitation

Project2023–20242024–20252025–20263 Year TotalSource
Brisbane and Hooper Street Traffic Signal Refurbishment
Rehabilitation of existing traffic signals.
$119k$119kPDF p.19 ↗
Eagle Street and Kruger Parade Traffic Signal Refurbishment
Rehabilitation of existing traffic signals.
$94k$94kPDF p.19 ↗
Guard Rail Roadside Furniture
This budget is for reactive unplanned guardrail replacement across the city.
$154k$162k$316kPDF p.19 ↗
Jones Road, Redbank Plains and Keidges Road Traffic Signal Refurbishment
Rehabilitation of existing traffic signals.
$133k$133kPDF p.19 ↗
Old Logan Road and Formation Street Traffic Signal Refurbishment
Rehabilitation of existing traffic signals.
$111k$111kPDF p.19 ↗
Road Pavement Marking Reinstatement
This budget is for programmed pavement marking replacement across the city.
$656k$686k$1.3MPDF p.19 ↗
Traffic Facilities Reinstatement
This budget is for unplanned and programmed street furniture replacement across the city.
$515k$535k$1.1MPDF p.19 ↗
Street Furniture Rehabilitation Total$1.3M$1.8M$3.2M

Water Quality Rehabilitation

Project2023–20242024–20252025–20263 Year TotalSource
McCorry Drive Basin Rehabilitation
Rehabilitation of the stormwater drainage basin on McCorry Drive, Collingwood Park.
$250k$550k$800kPDF p.20 ↗
Water Quality Rehab Reactive Works
This budget is for reactive unplanned bio-basin rehabilitation works across the city.
$166k$169k$335kPDF p.20 ↗
Water Quality Rehabilitation Total$250k$716k$169k$1.1M

Resource Recovery — total $18.1M

Resource Recovery

Project2023–20242024–20252025–20263 Year TotalSource
Commercial Bin Purchases
Purchase of new and replacement commercial bins.
$371k$398k$418k$1.2MPDF p.20 ↗
Domestic Bin Purchases
Purchase of new and replacement domestic bins.
$985k$880k$807k$2.7MPDF p.20 ↗
FOGO Bin Purchases
Purchase of new Food Organic and Garden Organic domestic bins.
$3.7M$3.7MPDF p.20 ↗
Riverview Recycling and Refuse Centre – Bin Storage Hardstand
Installation of a new hardstand area for bin storage at the Riverview Refuse and Recycling Centre, Riverview.
$10k$250k$260kPDF p.20 ↗
Riverview Recycling and Refuse Centre – Enhanced Resource Recovery Hardstand
Upgrades to the resource recovery hardstand area, at the Riverview Recycling and Refuse Centre, Riverview.
$500k$1.2M$1.7MPDF p.20 ↗
Riverview Recycling and Refuse Centre – Green Waste Pad Fencing
Installation of a fence to new green waste pad hardstand area, at the Riverview Recycling and Refuse Centre, Riverview.
$30k$30kPDF p.20 ↗
Riverview Recycling and Refuse Centre – Greenwaste Hardstand
Upgrade to the existing greenwaste area and stormwater drainage channel at the Riverview Recycling and Refuse Centre, Riverview.
$2.8M$2.8MPDF p.20 ↗
Riverview Recycling and Refuse Centre – Line Marking
Repair and upgrades to the line marking at Riverview Recycling and Refuse Centre.
$30k$35k$65kPDF p.20 ↗
Riverview Recycling and Refuse Centre – Litter Fencing
Improvements to and replacement of the litter control fencing at the Riverview Recycling and Refuse Centre, Riverview.
$20k$20kPDF p.20 ↗
Riverview Recycling and Refuse Centre – Recycle Street
Improvements to visualisations of resource recycling area, at the Riverview Recycling and Refuse Centre, Riverview.
$100k$150k$250kPDF p.20 ↗
Riverview Recycling and Refuse Centre – Reflooring of Pit
Undertake periodic resurfacing of the waste pit at the Riverview Recycling and Refuse Centre, Riverview.
$100k$40k$140kPDF p.20 ↗
Riverview Recycling and Refuse Centre – Slip Lane
Improvements to vehicle movement capacity at the Riverview Recycling and Refuse Centre, Riverview Road, Riverview.
$123k$123kPDF p.20 ↗
Riverview Recycling and Refuse Centre – Undercover Storage
Installation of flexible undercover recycling storage areas at the Riverview Recycling and Refuse Centre, Riverview.
$300k$300kPDF p.20 ↗
Rosewood Resource Recovery and Recycling Facility
Council is planning to upgrade the existing resource recovery and recycling facility at Rosewood.
$270k$270kPDF p.20 ↗
South-Eastern Waste Management Facility
Installation of a new South Eastern Resource Recovery and Recycling Facility to meet the growth needs of the city.
$1M$3M$4MPDF p.20 ↗
Western Resource Recovery and Recycling Facility
Installation of a new Western Resource Recovery and Recycling facility to replace the existing Rosewood Recycling and Refuse Centre.
$160k$350k$510kPDF p.20 ↗
Resource Recovery Total$10.1M$3.7M$4.3M$18.1M

Sustainability — total $1.1M

Climate Resilience

Project2023–20242024–20252025–20263 Year TotalSource
Art Gallery Lighting – Energy Efficient Improvements
Energy efficient upgrades to the Art Gallery Lighting System, Ipswich.
$75k$200k$275kPDF p.21 ↗
Climate Resilience Total$75k$200k$275k

Renewable Energy

Project2023–20242024–20252025–20263 Year TotalSource
Ipswich Art Gallery Solar System
Installation of a 25kW solar PV system at Ipswich Art Gallery, Ipswich.
$30k$30kPDF p.21 ↗
Leichhardt Swim Centre Solar System
Installation of a 10kW solar PV system at Leichhardt Swim Centre, Leichhardt.
$15k$15kPDF p.21 ↗
Nicholas Street Library Solar System
Installation of a 200kW solar PV system at Ipswich Central Library, Ipswich.
$280k$280kPDF p.21 ↗
Redbank Collingwood Park Sports Complex Solar System
Installation of a 60kW+ solar PV System at Redbank Collingwood Park Sports Complex, Redbank.
$100k$100kPDF p.21 ↗
Robelle Domain Solar System – Stage 1
Installation of a 60kW solar PV system at Robelle Domain (Stage 1), Springfield Central.
$100k$100kPDF p.21 ↗
Unallocated Solar System and EV Charging Projects
Installation of additional solar systems and EV charging stations across the city. Exact locations have not been confirmed at this point in time.
$150k$150kPDF p.21 ↗
Yamanto Depot Solar System
Installation of a 60kW+ solar PV System at Yamanto Depot, Yamanto.
$100k$100kPDF p.21 ↗
Renewable Energy Total$480k$145k$150k$775k

Fleet — total $40.5M

Fleet

Project2023–20242024–20252025–20263 Year TotalSource
FOGO Truck Purchases
Purchase new Food Organic and Garden Organics Waste Trucks.
$3.3M$3.3MPDF p.21 ↗
Major Plant Growth
Purchase new major plant to meet the growth demand of the city.
$661k$661kPDF p.21 ↗
Major Plant Replacement
Replacement of major plant assets.
$1M$1.5M$2.3M$4.9MPDF p.21 ↗
Minor Plant Growth
Purchase new minor plant to meet the growth demand of the city.
$29k$29kPDF p.21 ↗
Minor Plant Replacement
Replacement of minor plant assets.
$381k$102k$741k$1.2MPDF p.21 ↗
Motor Vehicle Replacement
Replacement of motor vehicle assets.
$905k$1.3M$1.1M$3.3MPDF p.21 ↗
Truck Replacement
Replacement of truck assets.
$2.9M$4.7M$3.9M$11.5MPDF p.21 ↗
Trucks Growth
Purchase new trucks to meet the growth demand of the city.
$1.1M$500k$500k$2MPDF p.21 ↗
Vehicles Growth
Purchase new vehicles to meet the growth demand of the city.
$305k$69k$374kPDF p.21 ↗
Waste Truck – Communications Upgrade
Upgrade to existing waste truck communication system to digital.
$536k$536kPDF p.21 ↗
Waste Truck Replacement
Replacement of waste truck assets.
$3M$1.4M$1.1M$5.4MPDF p.21 ↗
Waste Trucks – Commercial Growth
Purchase new Waste Trucks for collection of commercial bins to meet the growth demand of the city.
$954k$512k$400k$1.9MPDF p.22 ↗
Waste Trucks – Domestic Growth
Purchase new Waste Trucks for collection of domestic bins to meet the growth demand of the city.
$1.8M$2.1M$1.4M$5.4MPDF p.22 ↗
Fleet Total$16.8M$12.3M$11.4M$40.5M

Other — total $1.7M

Ipswich Central Revitalisation

Project2023–20242024–20252025–20263 Year TotalSource
Cultural Heart – Nicholas Street
Create a green and connected spine between d'Arcy Doyle and Roderick Street to support our cultural assets, walkability and accessibility.
$75k$100k$175kPDF p.22 ↗
East Street Streetscape Upgrade
Streetscape improvements and greening up East Street to improving walkability, connectivity and accessibility for all between David Trumpy Bridge to Court Street.
$100k$100kPDF p.22 ↗
Ipswich Central Revitalisation
Revitalisation projects within the Ipswich Central. Focusing on walkability, place movement and connectivity.
$175k$100k$100k$375kPDF p.22 ↗
Light Up Ipswich Central
Installation of fairy lighting in the fig trees in Brisbane Street, Ipswich.
$100k$100k$100k$300kPDF p.22 ↗
Ipswich Central Revitalisation Total$450k$300k$200k$950k

Specialist Equipment

Project2023–20242024–20252025–20263 Year TotalSource
Specialist Equipment
Purchase of new and replacement of existing specialised equipment.
$95k$100k$103k$298kPDF p.22 ↗
Office Furniture
Purchase of new and replacement of existing council furniture.
$23k$25k$27k$75kPDF p.22 ↗
Survey Equipment
Purchase of new and replacement of existing survey equipment.
$123k$130k$135k$388kPDF p.22 ↗
Specialist Equipment Total$241k$255k$265k$761k

Corporate Projects

Project2023–20242024–20252025–20263 Year TotalSource
ART GALLERY
Purchase of artwork, upgrade and replacement of furniture, fittings and equipment.
$206k$409k$440k$1.1MPDF p.23 ↗
IPSWICH CIVIC CENTRE/STUDIO 188 /NORTH IPSWICH RESERVE CORPORATE CENTRE
Upgrade and replacement of furniture, fittings and equipment.
$524k$680k$510k$1.7MPDF p.23 ↗
LIBRARY SERVICES
Upgrade and replacement of furniture and fittings, library pod deployment and logistics hub fitout.
$1.7M$261k$268k$2.2MPDF p.23 ↗
SPORT AND RECREATION
Minor works upgrades for sports facilities.
$200k$200kPDF p.23 ↗
COMMUNITY SAFETY AND INNOVATION
Upgrade and replacement of CCTV cameras and equipment, and upgrade of security systems.
$602k$675k$730k$2MPDF p.23 ↗
PLANNING AND REGULATORY SERVICES
Upgrade of animal management facilities, cemetery facilities and planning and regulatory systems.
$4.5M$5.1M$3.5M$13.2MPDF p.23 ↗
INFORMATION COMMUNICATIONS AND TECHNOLOGY
Upgrade and replacement of hardware, equipment and software to maintain and operate council's information, * communication and technology systems and infrastructure.
$3.1M$4M$4M$11.1MPDF p.23 ↗
NICHOLAS STREET PRECINCT REDEVELOPMENT
Construction and related costs of the retail precincts and council facilities.
$53.3M$2.6M$2.2M$58MPDF p.23 ↗
SEQ CITY DEAL
The SEQ City Deal is co-contributions from from federal, state and local governments across South East Queensland to deliver a significant package of investments that will generate local jobs, boost digital and transport connectivity, enhance liveability and support one of the fastest growing regions in the country.
$1.2M$1.2M$1.1M$3.6MPDF p.23 ↗
2022 FLOOD RECOVERY COSTS
Capital costs associated with council asset and environmental rehabilitation works resulting from the 2022 flood events. See page 24 for more information.
$75M$75MPDF p.23 ↗
VOLUNTARY HOME BUY BACK PROGRAM
Costs associated with the Voluntary Home Buy Back Program administered by the Queensland Reconstruction Authority (QRA). The cost is offset by grant funding provided by the QRA.
$20M$20MPDF p.23 ↗
iVOLVE STAGE
* Planning and implementation of council's 4 primary enterprise systems.
$4.1M$5.5M$1.6M$11.2MPDF p.23 ↗
SEQ MATERIALS RECOVERY FACILITY
Contribution to establishment of the South East Queensland Materials Recovery Facility.
$8M$8MPDF p.23 ↗
Corporate Projects Total$172.5M$20.5M$14.3M$207.3M

Grand total

2023–20242024–20252025–20263 Year Total
$267.2M$127.2M$107.8M$502.2M